![]() ![]() At the core of the terminal will be a soaring interior space called “The Canyon.” Planned with inspiring and interesting design elements and artwork, The Canyon will contain security screening, a large area for meeting and greeting arriving travelers, and plentiful shopping and dining concessions. A single, three-level terminal will be built to the west of the existing terminal complex and will feature spacious, modern facilities.Construction is being funded by several sources including federal grants, user fees, general airport revenue bonds, and airport reserves. The effort will create some 24,000 jobs and generate $1 billion in wages over the construction period. The first phase that includes the consolidated terminal will open in 2020. The $1.8 billion project will be built in phases and is planned to be complete in 2023. ![]() The effort will replace three aging terminals built 30- 50 years ago with one large, modern building with ample capacity for both the region’s local needs and the airport’s role as a major hub. The Salt Lake City International Airport Terminal Redevelopment Program will completely rebuild the outdated passenger terminal complex and related facilities at the Salt Lake City International Airport. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |